Max Pet Dog Tracking Rope Extra Long Lead Dog Leash for Training Tracking 20M
Description:
Brand new and high quality.
Made of polyester, sturdy and durable.
Help you gain control over the activity of walking your dog.
Wear Resistant , bite resistant, suitable for your pet, puppy, dog or cat.
Provide a safe environment, comfortable and controllable pet walk to the owner.
Specification:
Material: Polyester
Line Diameter: Approx.7cm/2.76inch
10M:
Length: Approx.1000cm/393.7inch
20M:
Length: Approx.2000cm/787.4inch
Package Includes:
1 Piece Dog Leash
Note:
Since the size above is measured by hand, the size of the actual item could be slightly different from the size above.
Due to the lighting effects, monitor settings, etc. There could be some slight difference in the color tone of the pictures and the actual item.
Delivery Time: 12-15 Days. Products are directly imported and dispatched from our Hong Kong warehouse. All India Shipping.
Return: If you have received a faulty or damaged product, please contact our support team within 7 days of delivery. We will investigate the issue and provide you with instructions on how to return the product for a replacement or a full refund.
Please Note: This is going to be a closed delivery, so if you want open delivery then it will not be possible and you can cancel your order by writing us at: support@aladdinshoppers.com before dispatch of your order.
Tracking Information will be sent to you once your product is dispatched.