Max Pet Dog Tracking Rope Extra Long Lead Dog Leash for Training Tracking 10M
Rs. 1,990.00Rs. 3,980.00
Description:
Brand new and high quality.
Made of polyester, sturdy and durable.
Help you gain control over the activity of walking your dog.
Wear Resistant , bite resistant, suitable for your pet, puppy, dog or cat.
Provide a safe environment, comfortable and controllable pet walk to the owner.
Specification:
Material: Polyester
Line Diameter: Approx.7cm/2.76inch
10M:
Length: Approx.1000cm/393.7inch
20M:
Length: Approx.2000cm/787.4inch
Package Includes:
1 Piece Dog Leash
Note:
Since the size above is measured by hand, the size of the actual item could be slightly different from the size above.
Due to the lighting effects, monitor settings, etc. There could be some slight difference in the color tone...
✓ Secure checkout
✓ Quality checks before dispatch
✓ Customer support for order assistance
Product details
Description:
Brand new and high quality.
Made of polyester, sturdy and durable.
Help you gain control over the activity of walking your dog.
Wear Resistant , bite resistant, suitable for your pet, puppy, dog or cat.
Provide a safe environment, comfortable and controllable pet walk to the owner.
Specification:
Material: Polyester
Line Diameter: Approx.7cm/2.76inch
10M:
Length: Approx.1000cm/393.7inch
20M:
Length: Approx.2000cm/787.4inch
Package Includes:
1 Piece Dog Leash
Note:
Since the size above is measured by hand, the size of the actual item could be slightly different from the size above.
Due to the lighting effects, monitor settings, etc. There could be some slight difference in the color tone of the pictures and the actual item.