{"product_id":"pet-dog-tracking-rope-extra-long-lead-dog-leash-for-training-tracking-10m","title":"Max Pet Dog Tracking Rope Extra Long Lead Dog Leash for Training Tracking 10M","description":"\u003cp\u003e\u003cb\u003eDescription:\u003c\/b\u003e\u003c\/p\u003e\u003cp\u003eBrand new and high quality.\u003c\/p\u003e\u003cp\u003eMade of  polyester, sturdy and durable.\u003c\/p\u003e\u003cp\u003eHelp you gain control over the activity of walking your dog.\u003c\/p\u003e\u003cp\u003eWear Resistant , bite resistant, suitable for your pet, puppy, dog or cat.\u003c\/p\u003e\u003cp\u003eProvide a safe environment, comfortable and controllable pet walk to the owner.\u003c\/p\u003e\u003cp\u003e\u003cbr\u003e\u003c\/p\u003e\u003cp\u003e\u003cb\u003eSpecification:\u003c\/b\u003e\u003c\/p\u003e\u003cp\u003eMaterial: Polyester\u003c\/p\u003e\u003cp\u003eLine Diameter: Approx.7cm\/2.76inch\u003c\/p\u003e\u003cp\u003e10M:\u003c\/p\u003e\u003cp\u003eLength: Approx.1000cm\/393.7inch\u003c\/p\u003e\u003cp\u003e20M:\u003c\/p\u003e\u003cp\u003eLength: Approx.2000cm\/787.4inch\u003c\/p\u003e\u003cp\u003e\u003cb\u003ePackage Includes:\u003c\/b\u003e\u003c\/p\u003e\u003cp\u003e1 Piece Dog Leash\u003c\/p\u003e\u003cp\u003e\u003cb\u003eNote:\u003c\/b\u003e\u003c\/p\u003e\u003cp\u003eSince the size above is measured by hand, the size of the actual item could be slightly different from the size above.\u003c\/p\u003e\u003cp\u003eDue to the lighting effects, monitor settings, etc. There could be some slight difference in the color tone of the pictures and the actual item.\u003c\/p\u003e","brand":"Aladdin Shoppers: Best Online Shopping site in India - Shop Now!","offers":[{"title":"Default Title","offer_id":43441821221045,"sku":"64019802","price":1990.0,"currency_code":"INR","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/2570\/5654\/products\/64019802_1_image.jpg?v=1703865123","url":"https:\/\/aladdinshoppers.com\/products\/pet-dog-tracking-rope-extra-long-lead-dog-leash-for-training-tracking-10m","provider":"Aladdin Shoppers","version":"1.0","type":"link"}